Get to Know About the Installation Steps of Braided Packing and PTFE Packing
Before fixing new packing, with the use of special tools the
used packing should be removed completely and the box of packing should be
mopped clean.
In order to see that if there is any part within the box of
being off-center, you have to observe carefully. The box should be repaired or
replaced in case of failure to be up to the required standard.
To seal the fluid select the right braided packing. With the packing, cutter cut the exact rigs.
While fitting, for valves cross-sections of packing should
be used, preferably pre-pressed rings, a packing cross-section with a slight
undersize (abt.0.3mm to 0.6mm) is recommended for pumps. The required leakage
gap ensures the necessary higher starting leakage for dissipation of friction
heat and lubrication.
There should be the installation of cut packing rings with the
cut ends staggered by 90° each layer. To be pushed on the shaft, the rings
should be axially and radially carefully opened. Rings can suffer damage
through buckling if they are opened.
Try to fix rings in the stuffing box unless the gland has
thread available to either about 50% in the case of pumps or about 25% the sealing packing thickness in the case
of valves.
It is preferential to select two or more gasket of cushion
plates, and mix them for the said fixing if there is a need to enhance the
tight sealing performance.
Tighten the nuts by hand and press the rings home with the
grand. we suggest the use of a torque wrench or a similar power measuring
device in order to obtain a uniform and controlled pretension of the aramid packing.
You should try it under zero-load before you put it into the regular operation, and observe if there is anything abnormal. After you put it into
normal operation, it is still important to observe carefully to see if there is
any kind of serious leakage due to lack of compactness or if as a result of
over compactness, there is friction-heat and the risk of ring burning.